Menu
Workflow

Coverage of our Chinese machine service

Technical research

Specification, power requirement, productivity and line compatibility analysis.

Factory and demo plan

Machine manufacturer, references and possible test scenarios.

Purchase agreement

List of accessories, warranty, spare parts and scope of delivery.

Admission test

FAT, video verification and functional verification before download.

Pre-preparation for transportation and installation

Packaging, loading, site access and installation preliminary plan.

Workflow

Chinese machinery project flow

Technical brief
01

Technical brief

Production purpose, output power and field conditions are collected.

Machine alternatives
02

Machine alternatives

Compatible manufacturers and models are compared.

Test plan
03

Test plan

Demo, video inspection and acceptance criteria are defined.

Contract and production
04

Contract and production

Completion and delivery conditions are confirmed in writing.

Loading and transportation
05

Loading and transportation

Safe packing and routing of the car is planned.

Post-installation preparation
06

Post-installation preparation

Preliminary documents are being completed for field acceptance and commissioning.

Workflow

The points we pay attention to when buying a car

Technical compliance

We check whether the machine is suitable for your factory site, power requirement and production rhythm.

Testing and acceptance

We check the specification on paper with real performance with a pre-load test.

Spare parts and documentation

We plan the support you need for manual, electrical plan, spare list and so on.

Get a Quote

Technically strengthen your machinery procurement

Please contact us with the technical details of your project, and we will suggest a suitable machine and purchase model.

Whatsapp